Ramon Airport

Israel, Eilat

Airports

Completed

Ramon Airport

Israel, Eilat

Airports

Completed

Ashtrom Industries, through its subsidiaries Israbeton and BG Bond, has provided a variety of building, bonding and coating materials as part of the construction works at Ramon Airport.     

57,000cu.m.

of Concrete

5,678

Bonding and coating materials

3.6km.

Length of flight runways

Ramon Airport
Ramon Airport

Building, Bonding and Coating Materials for National Infrastructures Project 

Works at the Ramon airport included the laying of take-off and landing runways with a length of about 3.6 km. and a parking apron for all types of aircraft.

As part of the construction works, Israbeton Ltd. manufactured 57,000 cu.m. of different types of concrete as well as cement plaster, white plaster and limestone plaster. The building materials were recycled, enabling protection of the environment and keeping the amount of polluting leftovers as low as possible. BG Bond Ltd. supplied 6,000 different materials such as bonding products, acrylic adhesives, paints and decorative coatings, as part of the cladding, waterproofing and concrete renewal operations.

Architects

Shafrir Collaborating Companies: Ashtrom Contracting via Drachim

product-image-1
product-image
product-image-2
product-image
product-image-3
product-image
product-image-4
product-image
product-image-5
product-image
product-image-6
product-image
product-image-7
product-image
product-image-8
product-image

Ashtrom Industries collaborating as project partners

Each contributing their individual professionalism and expertise